RISK ASSESSMENT

Click here to fill out the Risk Assessment Form, helpful guidelines included on the page.

 

SHOW BUILD UP

Please note that a strict high vis policy operates during the build up . Jackets are available at a cost from the LAMMA Office.

The showground is generally quiet on the weekend before the show and we would encourage exhibitors to set up then to avoid congestion, especially if there are large exhibits to be placed that would block the roadways e.g. with lorry cranes.

Lamma Blue Sky

THURSDAY NIGHT BREAKDOWN

For safety reasons Large  (Over 3.5 t)  vehicles are only allowed to exit on Thursday 19th pm breakdown in the following circumstances : 

  • There is good reason to remove the vehicle on Thursday pm e.g. ferry bookings, other shows, pre booked haulage etc.
  • They have pre –booked the movement with the LAMMA office giving the reason for movement and been issued a permit to exit.
  • There is no increased possibility of damage to the stand as a result of the movement.
  • The exit movement is marshalled by the LAMMA traffic control team in a controlled manner from stack points around the showground.

Please note there will be no contract forklift movements on Thursday 19, January PM

4.30 pm     Show Closed

6.00 pm     Heavy vehicles may be moved subject to a pre-booked permit to exit

7.00 pm     Vans and light vehicles permitted to enter and remove stand fittings and light equipment only

ALL INDOOR STANDS TO BE REMOVED BY 4PM FRIDAY 20 JANUARY

FORKLIFTS AVAILABLE FROM FRIDAY 20, JANUARY 7am

HIGH VIS TO BE WORN DURING BREAKDOWN

Build Up and Breakdown schedules

Use the document attached documents to identify the date that you can bring your machinery/ equipment to your stand

OUTDOOR STANDS 

INDOOR STANDS 

Underground services

The Peterborough showground site has many underground utilities including 11KV electrical systems, water, gas and telecoms. It is therefore imperative that all sites are assessed and scanned before breaking ground for stakes, flagpoles, fencing, marquees etc.

Scanning Contacts

Craig Sells or Den Stretton   – 07539 787755

   

PLAN The underground services plan is not 100% accurate but does give you a basic layout of the utilities on site.

Red Main 2016

NE Corner 

NW corner

SE corner

SW corner

SCAN Once onsite mark out your marquee / flagpole / dig sites and get these scanned using a Cable Avoidance Tool (CAT) detector. See contacts above.

ACTION If there is an area which conflicts with your marquee legs or flagpoles, then preferably move the structure at least 1 metre from the cable/utility. If you cannot move the structure then please spread the load of the leg or flagpole using a large footplate and weight down the structure with the appropriate static weight.

RESPONSIBILITY  It is the exhibitor’s / contractors responsibility to ensure that this safety procedure is followed and this record completed and a copy returned to the organiser’s office.

DEPTHS The cables were originally placed around 600mm deep, but if your scan does not give an accurate depth rating, then you must not guess and use short stakes. Water Gas and BT cables were also originally places around 600mm deep but this may not be consistent across the site

IF IN DOUBT DO NOT TAKE RISKS

The record form and process can be downloaded here

 

 

 

Working demonstrations and exhibits

Please note that these will need to be inspected by the LAMMA Health and Safety Advisor before the show and the Licence to operate  form completed.  

 

 

SPONSORSHIP OPPORTUNITY

LAMMA is the perfect platform to showcase your brand to the agricultural industry. With well over 900 companies expected to exhibit in 2018, LAMMA has become THE show on the agricultural calendar.

Countdown to 17th & 18th January 2018

clock
Headline Sponsor

AFP Main sponsor logo

lamma 2018

Media Partners

The Farming Forum

Farmers